In large construction and fabrication spaces, overhead/bridge cranes do the heavy lifting—literally. This field-tested breakdown follows the journey from bare runways to a commissioned crane ready for service. We’ll cover structural checks, safety, and QA/QC—with the same checklists pro installers use.
Bridge Crane Basics
An overhead crane rides on parallel runways anchored to a building frame, with a trolley that travels left-right along the bridge and a hoist that lifts the load. The result is smooth X-Y-Z motion: cross-travel along the bridge.
They’re the backbone of heavy shops and assembly lines, from beam handling to turbine assembly.
Why they matter:
Safe handling of very heavy, unwieldy loads.
Less manual handling, fewer delays.
Repeatable, precise positioning that reduces damage.
High throughput with fewer ground obstructions.
Scope at a Glance
Runways & rails: continuous beams and rail caps.
End trucks: wheel assemblies that ride the rail.
Bridge girder(s): single- or double-girder configuration.
Trolley & hoist: cross-travel carriage with lifting unit.
Electrics & controls: power supply, festoon or conductor bars.
Stops, bumpers & safety: overload protection, e-stops.
Depending on capacity and span, the crane might be a single-girder 10-ton unit or a massive double-girder 100-ton system. The choreography is similar, but the scale, lift plans, and checks grow with the tonnage.
Pre-Install Prep
A clean install is mostly planning. Key steps:
Drawings & submittals: Freeze the GA and verify reactions with the structural team.
Permits/JSAs: Permit-to-work, hot work, working at height, rigging plans.
Runway verification: Survey columns and runway beams for straightness, elevation, and span.
Power readiness: Confirm conductor bars or festoon supports, cable trays, and isolation points.
Staging & laydown: Mark crane components with ID tags.
People & roles: Appoint a lift director, rigger, signaler, and electrical lead.
Tiny survey errors balloon into hours of rework. Measure twice, lift once.
Rails & Runways
Runway alignment is the foundation. Targets and checks:
Straightness & elevation: Laser or total station to set rail height.
Gauge (span) & squareness: Use feeler gauges on splice bars, torque rail clips.
End stops & buffers: Install and torque per spec.
Conductor system: Keep dropper spacing uniform; ensure collector shoe reach.
Record as-built readings. Correct now or pay later in wheel wear and motor overloads.
Putting the Span in the Air
Rigging plan: Softeners protect painted flanges. Dedicated signaler on radio.
Sequence:
Install end trucks at staging height to simplify bridge pick.
Rig the bridge girder(s) and make the main lift.
Land the bridge on the end trucks and pin/bolt per GA.
Verify camber and bridge square.
Before anyone celebrates, bump-test long-travel motors with temporary power (under permit): ensure correct rotation and brake release. Re-apply LOTO once checks pass.
Cross-Travel Setup
Trolley installation: Hoist/trolley arrives pre-assembled or as modules.
Hoist reeving: Lubricate wire rope; verify dead-end terminations.
Limits & load devices: Set upper/lower limit switches.
Cross-travel western construction adjustment: Align trolley rails on a double-girder.
Pendant/remote: Install pendant festoon or pair radio receiver; function-test deadman and two-step speed controls.
A smooth trolley with a quiet hoist is a sign of good alignment. Fix the mechanics first.
Drive Tuning & Interlocks
Power supply: Drop leads tagged and strain-relieved.
Drive setup: Program VFDs for soft starts, decel ramps, and brake timing.
Interlocks & safety: Zone limits near doors or mezzanines.
Cable management: Keep loops short, add drip loops where needed.
Future you will too. If it isn’t documented, it didn’t happen—put it in the databook.
ITP, Checklists, and Sign-Off
Inspection Test Plan (ITP): Third-party witness for critical steps.
Torque logs: Record wrench serials and values.
Level & gauge reports: Note any corrective shims.
Motor rotation & phasing: Confirm brake lift timing.
Functional tests: Anti-collisions and zone interlocks.
A tidy databook speeds client acceptance.
Load Testing & Commissioning
Static load test: Apply test weights at the hook (usually 100–125% of rated capacity per spec).
Dynamic load test: Check sway, braking distances, and VFD fault logs.
Operational checks: Emergency stop shuts down all motions.
Training & handover: Operator basics, daily pre-use checks, rigging do’s & don’ts.
Only after these pass do you hand over the keys.
Applications & Use Cases
Construction & steel erection: handling long members safely.
Oil & gas & power: generator and turbine assembly.
Steel mills & foundries: hot metal handling (with the right duty class).
Warehousing & logistics: high throughput lanes.
Once teams learn the motions, cycle times drop and safety improves.
Safety & Engineering Considerations
Rigging discipline: rated slings & shackles, correct angles, spreader bars for load geometry.
Lockout/Tagout: test before touch every time.
Fall protection & edges: scissor lifts and manlifts inspected.
Runway integrity: no cracked welds, correct bolt grades, proper grout.
Duty class selection: match crane class to cycles and loads.
Safety isn’t a stage—it's the whole show.
Keep It Rolling
Crab angle/drift: verify end-truck wheel diameters and gearbox mounts.
Hot gearboxes: misalignment or over-tight brakes.
Rope drum spooling: check fleet angle and sheave alignment.
Pendant lag or dropout: antenna placement for radio; inspect festoon collectors.
Wheel wear & rail pitting: add rail sweeps and check clip torque.
Little noises are messages—listen early.
Fast Facts
Overhead vs. gantry? Bridge cranes ride fixed runways; gantries walk on the floor.
Single vs. double girder? Singles are lighter and cheaper; doubles carry heavier loads and give more hook height.
How long does install take? Anything from a couple weeks to a few months.
What’s the duty class? FEM/ISO or CMAA classes define cycles and service—don’t guess; size it right.
What You’ll Take Away
Students and pros alike get a front-row seat to precision rigging, structural alignment, and commissioning. You’ll see how small alignment wins become big reliability wins.
Want ready-to-use checklists for runway surveys, torque logs, and load-test plans?
Get the toolkit now and cut hours from setup while boosting safety and QA/QC. Bookmark this guide and share it with your crew.
...